looking good…taken yesterday afternoon
just need to replace some hardware and the sconce
even without the floors redone, it looks much better – love the afternoon light the room gets
and the little book nook – they fixed all the cracked and peeling plaster and gave everything a fresh coat of paint – glorious!
but Jess just download some photos from yesterday…too good not to share
L.A. is so freakin cool – we get to have NINJAS paint our house
duct work running everywhere in the basement, even up the stairs
mega-robot octopus wants to hug you with its long warm tentacles
we decorated early for halloween - you like?
stripped of its knobs – the cabinets get 40 years of food painted over – i mentioned we didn’t clean anything first right? (kidding mom)
rather than buy new furniture for the living room, we went with this modern art installation – money well spent don’t you think?
I haven’t seen the house since Sunday….thanks to the fact that it’s only wednesday and i’ve put in over 43 hours at work….but Jess has been doing a great job of keeping me up to speed on the progress of things.
Here are the updates from the 26th…They’re still working on the giant robot octopus in our basement…and here you see the kitchen and bathroom getting prep’d for their face lift via a coat of paint.
enjoy.
no – not so much..
We got a big chunk of the boxes out of the rental last night and over to the house…but there’s still so much to do. My work week is going to be intense so J is sadly going to have to do alot of the nightly back and forth himself – until thursday eve when I can jump back in and help.
The garage is filling up fast – we’ve got it about 1/4 full now – but need to leave room for Vick and Salah to finish the HVAC work. They’re scheduled to be done tomorrow most likely. But this brings me to my next internal stuggle…we need to start moving in and almost every room is still being worked in or on. This greatly reduces our opportunities to bring stuff over.
Another early morning list…just because I need to do one…
So, we’ve got the Garage, Den, possibly the 2nd bedroom and the hall closets – and hopefully all the other work will be done and dry by saturday morning.
Just taking a 15 minute break before driving another car load of stuff over to the house. Today we did an early morning check in with Juan Jose to point out a couple of things that needed re-touching and ended up finalizing plans to paint the living room, kitchen and bathroom. I made sure to point out what in the kitchen needed to be scraped, tossed out and patched. I can’t believe we’d gone this far already…it kinda makes my head spin. The heater is pretty much installed as well and looks like we have a giant prone robot in the back corner of our basement…it’s cool looking. I also managed to squeeze in a few hours at the office and came home to pack up the kitchen around 1 – and then J and I started shuttling boxes to the house. We’re just inhaling some dinner now and will make one last run tonight and take some photos of the work that was done today. The bedroom is nearly ready – just need the new fan put in – so I can’t wait to see it.
Here are some photos from yesterday…
There’s still lots to be done and the clock is ticking until we absolutely have to be out of rental…here’s hoping we can get it all done in time.
The kitchen floor stained – waiting for a coat of urethane – afterward the whole kitchen will be painted.
freshly painted stairwell..
The past 2 days have had 4am wake-up calls and ended in me getting home too late to go the house to see progress…but Jess has been checking in on things and keeping everything on track. We’re packing up the last of our stuff here and transporting some to the house tomorrow.
Just to keep things rolling – here’s the latest list:
While neither Jess or I could be at the house to document the action – our amazing crew demolished the darkroom and removed the old duct work and furnace from the basement – opening up an amazing amount of space!!!
Jess took the “after” photo – and next to my “before” photo, it’s pretty dramatic.
the before -complete with bongos in the background and lots of junk
and the after – oodles of room for my studio space,laundry and the furnace!
The other good news was someone actually took the old fridge home with them, so it went to good use!
Probably tomorrow the hvac units show up – and then thursday the wall work will ramp back up.
I was just done with this post – and J asked where “the list” was…here ya go.s
I’m beat today – i didn’t really do any “work” – but am feeling pretty wiped out by the intensity of everything over the past 3 1/2 days.
All the guys got right to work this morning on the plaster and on finishing up the drywall. The electrical was also embedded into the walls in the two bedrooms and will make them much nicer now.
We need to shop for 2 ceiling fans and 3 sconces so things can be rewired in the bedrooms once they are painted. The HVAC is on track and they pull the asbestos out tomorrow morning. All in all, things are chugging along very quickly. I also removed all the safety bars from the upstairs bathroom and while dirty, looks much better too (J has a photo on his flickr)
I did have a slight side adventure today tho’ – when I ran home to walk the dogs at noon, I locked myself out of our rental (dogs were already safely back inside) and had to ask our neighbor S.C. to let me borrow his phone (and for J’s cell number which I still haven’t memorized)…so lame of me. It’s hilarious because just moments before I was chanting my “to do ” list to myself so I wouldn’t forget anything in my running around and sure enough managed to forget my bag with everything in it……….
It’s good to be home, full and showered – but not ready to head back to work. It’s going to be a very long 2 work weeks and I’ll be lucky if I get to see the house again before this saturday.